Laserfiche WebLink
<br />' The mining, processing, and batching operations <br /> generally will be conducted during the normal <br />' work week, Monday thYough Friday, between the <br /> hours of 7:00 A.M. end 6:00 P.M. During peak <br />' demand periods, work could occur on Saturdays. <br /> For the mining and crushing operations, there <br />~ ' is generally a shutdown period during the severe <br /> winter months et which time only maintenance <br />' end reclamation activiti <br />ti <br />C <br />t <br /> es con <br />nue. <br />oncre <br />e <br /> batching ie also greatly curtailed during very <br />~ ' <br /> cold weather. <br />i ' At the processing site, stockpiles of gravel <br /> products will be arranged in such a manner as <br />' to partially enclose the crushing, washing end <br /> concrete batching operations. This arrangement <br />' has been very effective in deflecting plant noise <br /> and reducing the visual intrusion of the plant <br />' equipment when applied et other locations. <br /> This operation will produce aggregate for <br />' use in the manufacture of ready mix concrete, <br /> for road base, and possibly for transport by <br />I <br />' truck to other concrete batch plants owned by <br /> C & M in Weld and Boulder counties. Some of <br />' th <br />l <br />ll <br /> e aggregate materia <br />s wi <br />be sold to local <br />' contractors, individuals, or construction projects. <br />MINING <br />' SEQUENCE After the drainage ditch has been relocated <br /> and the dewatering trench has been installed <br />' around the perimeter of the mining area, gravel <br /> extraction will begin in the southeasterly portion <br />(' of the permit area. The mining will progress <br />I <br /> D-5 <br />