Laserfiche WebLink
<br />j ~ to provide some diversity end visual appeal end <br /> to improve the wildlife habitat potential. Special <br />J <br />care will also be taken in grading and seeding <br /> the shorelines to quickly establish vegetative <br />1 ' cover to assist waterfowl and reduce bank erosion. <br /> The recommendations of the Larimer County Extension <br />f Service and the Soil Conservation Service will <br />~ be followed regarding plantings around the lake <br /> d f <br />th <br />l <br />i <br />d <br />t <br />Th <br />d <br />t <br /> an <br />or <br />e rec <br />a <br />me <br />pas <br />ure. <br />ese recommen <br />a <br />ions <br />~ ' are shown in Exhibit B, in this section, and <br /> on the Reclamation Plan Map. Final selection <br /> of seed mixes around the lake will depend on <br /> cost end species availability. The remainder <br /> of the disturbed land will be returned to agricultural <br /> use, primarily hay meadow and pasture using the <br /> seeding mix end fertili2er application as recommended <br /> by the Soil Conservation Service. <br />4 Reclamation of an area will commence as <br /> soon as the gravel has been removed and it is <br />1 , no longer necessary to move heavy equipment across <br />~ the site. The area to be reclaimed is rough-graded <br />t to th <br />t <br />i <br />di <br />t <br />th <br />d <br />i <br />d <br /> e con <br />ours as <br />n <br />ca <br />e <br />e <br />raw <br />ngs. <br />on <br />I <br />4.~ The <br /> <br />th side slopes from existing land levels to <br /> <br />i <br />d <br />i <br />l fi <br />d <br />il <br />b <br />l <br /> e rec <br />me <br />agr <br />cultura <br />el <br />s w <br />l not <br />a <br />e <br /> ste eper than a 3 to 1 slope. The slopes adjacent <br />' to the AT&T cable and the Wyco pipeline will <br />' be 3 to 1. Previously stockpiled overburden <br /> mat erial is then placed back over the area, varying <br />' from 1 to 9 feet thick, to complete rough-grading. <br />Six to twelve inches of topsoil is placed over <br />I' the overburden and fine-graded in preparation <br />'' E -2 <br />