Laserfiche WebLink
1 <br />' for seeding. Once the site has been graded and <br /> prepared, seeding will be done between October <br />' 15th end Mey 15th. <br /> When all mining h as been completed, the <br />' l <br />t ill b <br />d d il <br />h <br />k <br />f <br />i <br />l <br /> p <br />an w <br />e remove an e stoc <br />es o <br />t <br />p <br />mater <br />a <br />' will be eliminated as the market demands. The <br /> final reclamation will be to fill any remaining <br />1 settling ponds, grade the processing site, and <br />complete revegetetion. The mein access road <br />' will be excavated end the material contaminated <br />by oiling will be suitably disposed of. The <br />' access road will then be returned to agricultural <br />production as part of the adjoining fields. <br />' Any compacted areas will be ripped prior to seeding. <br />If very dry conditions exist at the time of seeding, <br />' mulching will be utilized to assist in plant <br />' establishment. Mulching will consist of straw <br />disked into the soil at the rate of two tons <br />' per acre. <br />The proposed post-mining land use complements <br />' the agricultural uses to the north, south, and <br />west. A gravel mining operation borders the <br />1 ' eastern boundary. <br />1 <br />3 <br /> <br />1~ <br />~' E-3 <br />