My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117968
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:40 PM
Creation date
11/25/2007 4:34:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002046
IBM Index Class Name
Permit File
Doc Date
9/25/2002
Doc Name
comments concerning review
From
dmg
To
Ephermeral Resources LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deep) will be constructed within the existing easements. This is <br />reflected on the reclamation plan. <br />2. The petitioner agrees to modify the two existing manholes by <br />installing T-Lock manhole barrel sections and adjusting the <br />manhole rim to finish grade. <br />3. The petitioner is coordinating with the District to review the <br />easements and the physical location of the sewer lines. The <br />District will verify locations and will notify the petitioner of any <br />necessary adjustments that are required to their easements. <br />4. Understood. Once the District documents the condition of the <br />sewer line, the developer requests a copy of their findings. <br />5. Understood. A request has been made to the District to obtain a <br />copy of their television log to locate the- sewer service. The <br />District's contractor will be utilized to abandon the service line. <br />6. Understood. Any manholes that are affected by the D Road <br />improvements will be adjusted to finish grade. <br />Grand Junction Drainage District <br />1. The Book and Page numbers for both the Beswick and Odelberg <br />Drains are labeled on the appropriate drawings. <br />2. There are no improvements planned for the Beswick Drain. <br />Therefore the capacity of the channel will not be impacted. <br />3. The petitioner has recently received an agreement from the GJDD <br />for discharges into both the Beswick and Odelberg Drains. Once <br />the agreement has been reviewed and executed, a copy will be <br />provided to the City. <br />5. Enclosed is a revised General Project Report. The location of the portable <br />toilets, fuel/water storage and office/lab varies dependent upon the <br />location of the portable crushing equipment within the identified mining <br />areas. The above-indicated facilities will also be located within the <br />identified Staging Area <br />6. What has been previously described as a 20' ROW' and a 40' easement <br />that run north-south through the center of the property is a recorded Deed <br />to construct a road. This strip of land has been incorrectly identified as an <br />easement and a ROW. Since the petitioner owns all properties mentioned <br />in the original document, no further action is necessary. <br />The abandonment of the easement for Central Grand Valley Sanitation <br />has been coordinated with CGVSD, discussed above <br />7. Information for erosion control is provided on a Stormwater Management <br />Plan attached with the Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.