My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117436
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:11 PM
Creation date
11/25/2007 3:46:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER C Part 3.9 REFUSE DISPOSAL SITE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />ESPEY, HUSTON 6 ASSOCIATES, INC. <br />/ • <br />The major modification in soil characteristics in the topsoil and subsoil <br />will be the physical properties. Very fine sandy clay loam of the Shawn series will <br />be mixed with the silty clay loams of the other three series. Alteration will occur in <br />the blocky and columnaz structure. <br />13.5.3.1 Refuse Prepazation Prior to Topsoil Replacement <br />The refuse will consist predominantly of claystone material. This refuse <br />material will act, to a degree, like underlying bedrock and will typically not provide <br />plant growth medium for revegetation. <br />During construction of the refuse pile, the waste will be compacted to <br />approximately 85 percent of ASTM D6g8 maximum density. This compaction should <br />not effect water percolation or infiltration into the refuse pile from the replaced <br />subsoil and topsoil. This infilitration into the refuse material should prevent piping, <br />perching of soil moisture, and soil movement. <br />Refuse will be graded through the use of a bulldozer or equivalent <br />equipment for leveling the waste material. Regrading activities will be conducted <br />on the contour of the embankments to establish a pattern of surface roughness <br />features approximately.perpendiculaz to the slope of the refuse pile. These rough <br />surfaces will act to anchor the topsoil material. <br />13.5.3.2 Topsoil Replacement Operations <br />Topsoil replacement will be accomplished using rubber fire scrapper or <br />equivalent equipment that can safely operate in the azea. Topsoil will be replaced <br />when in a moderately dry condition only, in order to minimize clodding and <br />compaction. Inspections will be conducted periodically to ensure proper depth and <br />spoil density, 80-95 percent of ASTM D698 maximum density, aze attained. The <br />surface of the spoil layer will be left in a rough or furrowed condition along the <br />• <br />13-21a <br />
The URL can be used to link to this page
Your browser does not support the video tag.