My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117436
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:11 PM
Creation date
11/25/2007 3:46:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER C Part 3.9 REFUSE DISPOSAL SITE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eh ESPEY, HUSTON &ASSOCIATES, INC. <br />• <br />contours to minimize erosion and maximize available soil moisture during the time <br />period between topsoiling and seeding-mulching operations. The following pro- <br />cedures will be utilized in replacement of topsoil for those azeas that have been <br />disturbed: <br />o Refuse Pile. Approximately 12 inches of topsoil will be placed on <br />top of the refuse layers. An interface between the topsoil and <br />refuse will be accomplished through the use of bulldozer or <br />equivalent equipment equipped with ripper shanks which will make <br />parallel cuts on the contour passing the shanks through the topsoil <br />(A horizon) and into refuse material. This procedure should mini- <br />mize compaction, prevent or minimize topsoil slippage, and is the <br />initial stage of seedbed prepazation. A second 12-inch lift will <br />then be distributed and ripped in similaz fashion. <br />• o Haul Road. At the compaetion of the haul road's usefulness for <br />refuse disposal and reclamation, the surfacing materials will be <br />ripped and removed from the area. After the removal of the <br />surfacing material, the haul road azea will be cut and filled where <br />necessary to establish the approximate premining contours. Ap- <br />proximately 12 inches of topsoil (A horizon) will be replaced over <br />the regraded surface. The retopsoiled area will be ripped (along <br />contours, where possible) to create an interface with the under <br />lying soil layer to reduce compaction, increase soil moisture <br />retention, and minimize or prevent topsoil slippage. A second <br />12-inch lift will then be distributed and ripped in similaz fashion, <br />o Sedimentation Pond and Associated Hydrologic Control Structures. <br />Sedimentation pond and ditches will be removed and premining <br />topography restored when drainage entering the sedimentation <br />pond meets state and federal water quality standards. The pond <br />r1 <br />U <br />13-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.