Laserfiche WebLink
<br />• <br />Exhibit F, for original contours) and the stockpiled topsoil will be placed <br />over the area. Once again, fertilization and seeding will be accomplished as <br />explained for slopes in Area #1. Shrub tubelings will be transplanted with <br />the same species and the same rate as for the slopes of Area #1. Straw mulch <br />will be added at 2,000 lbs/acre and crimped in. <br />Reclamation will begin within one year of abandonment. <br />Summary <br />The present size of the disturbed area is 2.96 acres. An erosion control <br />basin is being constructed in 1981 and the topsoil stored on a site approved <br />in the technical revision of June 25, 1981. <br />~roa #1 r, <br />Communications facility located in the SE-1/4 of the NE-1/4 of Section <br />25. An area of 1.00 acre. The fa:ilities are presently in place. During <br />1978-1979, bare areas not used will be broadcast seeded with the same species <br />and rates as explained for benches in Area #1. Fertilizer will be applied at <br />the same rate previously explained. Straw mulch will be added at 2,000 <br />lbs/acre and covered with jute matting and fastened down. Upon abandonment <br />the topsoil will be brought in and placed on the area to a depth of 6 inches. <br />This will be twice what was originally on the area. Shrubs will be <br />transplanted and seed will be applied as described for the slopes of Area #1. <br />Straw mulch will be applied at the rate of 2,000 lbs/acre and jute matting <br />placed over the top and fastened down. <br />Reclamation will commence within one year of final abandonment. <br />Summary <br />The present size of the area is 0.11 acres. <br />Area #17 <br />Exhaust stack and access road located in the NE-1/4 of the NE-1/4 of <br />