<br />Summary <br />Area 8 was reduced to 1.3 acres with a technical revision on March 13, <br />1979. There is presently 0.41 acres disturbed and being utilized. Due to a <br />lack of sufficient topsoil-like material, there was no stockpile of soil. Any <br />necessary topsoil will be brought in to meet the requirements of the plan. <br />Area #9 <br />Power substation located in the NE-1/4 of the NE-1/4 of Section 25. An <br />area of 3/4 acre. This substation is in existence. Upon abandonment, topsoil <br />will be brought in and placed on the site to a depth of 8". This will be <br />twice that previously existing on this site. The same species and rates of <br />shrubs and grasses wilt be transplanted and broadcast as has been explained <br />for the benches in Area #1. <br />Fertilizer will be applied at the same rate as previously explained. <br />Straw mulch will be applied at 2,000 lbs/acre and crimped in. Reclamation <br />will commence within on year of final abandonment. <br />Summary <br />Areas 9, 17, and 19 have been, for all practical purposed, integrated <br />into one area and will be described in the summary for Area #19. <br />Area #10 <br />Helo pad located in the NE-1/4 of the NF-1/4 of Section 25, an area of <br />1.00 acres. This helo pad was constructed in 1975 and has a vegetative cover <br />presently on it. Upon abandonment, the surface v,ill be ripped and <br />recontoured. The same species and rates of shrubs, transplants and seeds will <br />be applied as previously explained for the benches in Area #1. Straw mulch <br />will be applies at 2,000 lbs/acre and crimped in. <br />Keclamation will commence within one year of abandonment. <br />Summary <br />There are 0.24 acres disturbed at this site. <br />