Laserfiche WebLink
y. • • <br />Their control of run off cpuld be improved by constructing retention <br />reservoirs which should be located so that the reservoir bank is not <br />the same bank or sloped sides of the electric transmissions or water <br />line easements. <br />In addition, all slopes including easement slopes must be protected <br />from water and/or wind erosion. We believe the stabilization should <br />include permanent structures for control of run off surface water. <br />JFB/1 j ~~ <br />cc: B.G. Godec <br />