The next phase after removal of the vegetation and topsoil is the extraction of <br />the resource (sand and gravel), which will be accomplished with front-end <br />loaders, dozers, scrapers, backhoe excavators, draglines, or any surface mining <br />type of equipment that is economically feasible for this site. <br />As explained above, this is an open pit surface mine, and mining and <br />construction equipment design for this task will be used for earthmoving and <br />transporting both on site and trucking off site. <br />All earthmoving will be done with machinery designed for the job, e.g. Dozer, <br />front-end loaders, scrapers, excavators, etc. <br />No water diversions or impoundments are planned for this project. <br />The size of maximum disturbance will be approximately 9.5 acres at any one <br />time, and will consist of a combination of mining, processing, stockpiling and <br />reclamation. <br />Mining will be done on a continuing program every year as the demand warrants. <br />Therefore, an approximate timetable is that as project in the area need <br />materials, mining will occur. <br />The various stages or phases of the operation will be dictated by market <br />demand. This mine will not be a phased operation, but will be based on a <br />floating bond of 9.5 acres affected any one time. As mining progresses, <br />reclamation will follow. After an area is mined, the backsloping and contouring <br />of the side walls and pit floor will be done, and topsoil spread for seedbed <br />preparation, and as weather permits, planting will be done. All of the <br />reclamation will be accomplished in a timely manner in order to establish the <br />vegetation, and allow the operator/applicant to open more of the pit area for <br />extraction, and maintain the affected area. <br />It is estimated that the size of the excavated area will be 5 acres at any given <br />time, and that the remaining 4.5 acres will be devoted to product stockpile, <br />topsoil stockpile, and all the related processing equipment, which will include <br />portable crushing, and screening plants. This will account for the 9.5 acre <br />floating bond. <br />Sequencing the events of the mining operation are as the market demands, and <br />it is not feasible to predict with any accuracy at this time, however, as stated <br />above the plan is well thought out and will be done in manner to facilitate <br />reclamation. The life of this mine will be over 5 years. <br />