Laserfiche WebLink
D, LOADING OUT FROM RAW MATERIAL STOCKPILE: - N/A <br />.Method of loading out (front-end loader, conveyor, etc.): <br />Loading schedule: tons/hour, hours/day, days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial exposure, moist material, other (specify): <br />VI. PROCESSING - N/A <br />Will processing (i. e., crushing, screening, etc.) occur on site? ^ Yes ^ No (check one). <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMTI' APPLICATION AND APEN <br />(SEPARATE FORM IS ATTACHED AT END OF THIS FORM -MAKE ADDITIONAL COPCES AS <br />NEEDED). <br />Material loaded into processing equipment by: <br />^ Conveyor ^ Front end loader ^ Other: <br />CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify moisture % if known), <br />water spray ba: s, bag filters, other (specify), no control. If existing processing equipment will be relocated <br />from another location complete the following sections. This equipment must already be permitted. <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br />A. PRIMARY CRUSHING - N/A <br />Maximum tons crushed per year: tons. Maximum tons crushed per hour: tons. <br />Hours of crushing per day: hours. <br />Proposed controls for primary crushing (see above): <br />B. SCREENING/CLASSIFYING - N/A <br />Maximum tons screened per year: tons. Maximum tons screened per hour: tons. <br />Hours of screening per day: hours. <br />~roposed controls for screening (see above): <br />5 <br />