Laserfiche WebLink
V. RAW MATERIAL <br />.4. REMOVAL <br />• <br />MATERIAL ROCK COAL OTHER <br />Tons removed er ear 1,100,000 <br />Maximum tons removed er da 9,000 <br />Equi~oment used for removal Hydraulic <br />excavator <br />E ui ~ment ca acit in tons 12 <br />Estimated hours er ear re uired for removal 2,350 <br />Is maRerial d ,moist, or wet? Moist <br />Specmfy moisture content if known (%) 13.5% <br />13. LOAD[NG INTO RAW MATERIAL STOCKPILE - N/A <br />Method of loading in (truck bottom dump, front-end loader, etc.): <br />Loading schedule: tons/hour, hours/day, days/year • <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total enclosure, partial enclosure, chemical suppressants, reduced drop <br />height, telescoping chute, other (specify): <br />C. RAW MATERIAL STOCKPILE - N/A <br />MATERIAL ROCK COAL OTHER <br />Maximum tons stored at an one time <br />Length of time pile remains undisturbed <br />Proposedl controls for raw material stockpile: (check appropriate boxes) <br />^ bVatering: times/day, or ^ continuous sprinkler (to maintain moist surface). <br />^ C'hemical stabilizer (Type: ). <br />^ C'ompacting of piles, method: <br />^ E.nclosures: complete, or partial (check one). <br />^ Other (specify): <br />^ No control. <br />4 <br />