Laserfiche WebLink
C. SECONDARY CRUSHING - N/A <br />Maximum tons crushed per year: tons. Maximum tons crushed per hour: to~ <br />Hours of crushing per day: hours. <br />Proposed controls for secondary crushing (see above): <br />D. RESCREENING/CLASSIFYING - N/A <br />Maximum tons screened per year: tons. Maximum tons screened per hour: tons. <br />Hours of rescreening per day: hours. <br />Proposed controls for rescreening (see above): <br />VH. CONVEYORS/TRANSFER POINTS - N/A <br />,~. CONVEYORS - N/A <br />Tons of material conveyed per year: tons. Tons of material conveyed per day: tons. <br />Proposed controls: <br />Controls for conveyors include: Full enclosure, partial enclosure, no control, other (specify): <br />(INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET UP) <br />13. TRANSFER POINTS - N/A <br />Number of transfer points: <br />Proposed controls: <br />Controls for transfer points include: Full enclosure, partial enclosure, water sprays, chemical suppressants, no <br />controls, other (specify): <br /> <br />6 <br />