Laserfiche WebLink
SEP-08-2005 THU 12 41 PM BANKS AND GESSO LLC FAX N0, 303 274 8329 <br />. ~. <br />' Sta#e Hi hway Access Permit <br />Attachment to Permit No. 105070 - AddRlonal Terms and CondiBons <br />Permittee/Contractor/Engineer shag submit en "As Built" plan, showing in Beta ]all construciton changes, <br />modifications and revisions. All changes, modifications and rev[sions shall be Baled and signed by a <br />Colorado Registered Professional Engineer. The submittals shall be placed in box labeled with all fire <br />contents and shall be submitted tothe Department represertative. <br />24. The Department will require the permittee to retain a Professional Engineer (P to be in Responsible Charge <br />of Construction Observation. Tho PB's responsibilities include, but are not limi ed to: <br />1. 'The PE in Responsible Charge: of Construction Observation shall evaluate a <br />specifications with ttgard to the roadway improvenente within the State HighN <br />responsibilities shall be ea defined in Section 5 of the BYLAWS AND RULE3 <br />REGISTRATION FOR PROPE5SIONAL ENG]NEERS AND LAND SURV)3' <br />of the latest CDOT Standard Specifications for Rcad and Bridgc Construction. <br />the contractor's compliance on all aspects of construction including Conauvetlo <br />mpliance with plans and <br />ty Right of Way . The PE's <br />~F THE STATE BOARD OF <br />'ORS and the relevant sections <br />The PE shall carefully monitor <br />i WorkZoan'Tra~c Control. <br />2. Engineering Cettification: Auer inspection and before conditional acceptan e, the PE shall certify to <br />CDOT, in writing, that all inspections, materials, materiels testing, and cans lien methods conform to the <br />plane, specifications anal purpose of the design. Tiu PB shall be exporicnced n d oompetent in road'end <br />bridge construction management and inspcction and matetiels testing. Certifie ~on is defined as a statement <br />that includes all of the following: <br />a, Is sealed and signal by a PE representing that the engineering services ad sad therein have been <br />performed by tht: PE, or under the Professional Bngineer Sn Responsibl6 ; <br />b. is based upon the PE's knowledge, information, and belief; and <br />c. is in accordance with ail applicable CDOT standards and the approved sons lion plans. <br />The letter of certificeiton and a copy of all test results shall be sent to The Col o Department of <br />Transportation, Region One Traffic Section at 18500 East Colfax Ava, Aurora CO.80011. <br />25. The Fermittee must have available for review at the tithe of conditional accept ce, all documents rotating to <br />conatruetion (fie: plena, project correspondence, materials testing and survey no ). <br />26. In eccordanoe with Section Z.5 (~ of the State Highway Access Code, final acc lance of the access <br />improvomonts by CDOT, Region One, will be provided to the Petmittee in wri g two (2) years from the date <br />of construction completion. Ifyou have not received a final acceptance letttx ' two years, please content the <br />Region One Access Manage' at 303-757-9126. <br />27. It shall be the responsibility of the Pcrmitee to verify the location of the existin utilities and notify all utility <br />owners or operators of any work that might Involve utilities within the State Hi way right-of--Way. Any work <br />necessary to protect existing permitted utllitias, such u an etuaaement will be a responsibiliiy of the <br />Permittce. Any damage or diatuption to any utilities during the consdvetion sh 11 be the Permittee'a <br />responsibility and shall be repaired or replaced at no cost to the Deparitent, issuing authority, or the local <br />jurisdiction. Utilities camwt remain under asphalt or concrete without prior ap va1 from CT)OT. <br />28. All workers within the State Highway right-of-way will eotaply with their empl yea's safety and health <br />policieslprocedures, and all applicable U.S. Occupational Safety and Health A ' istration (09HA) <br />regulations -including, but not limited to the applicable sections of 29 CPR P 1910 -Occupational Safety <br />and Health Standards and 29 CRF Part 1926 -Safety end Health Regulations fo Conatruetion. <br />