Laserfiche WebLink
5EP-08-2005 THU 12 41 PM BANKS AND GESSO LLC FAX N0. 303 274 8329 <br />State Highway Access Permit <br />Attachment to Permit No. 105070 -Additional Terms and Condltlons <br />improvement (s) within the Sffite Highway shall be in accordance'with the fo11 ing Department standard <br />references, ea applicable: <br />a. Roadway Design Manual <br />b. Matcriats Manual <br />c. Construction Manual <br />d. Standard Specifications for Road and Bridge Construction, latest editton <br />e. Colorado Standard Plana (M 6t S Standards) <br />f. Manuel'On Uniform TrafSc Control Devices (M17TCD) for streets and high aye and the latest Colorado <br />Supplements <br />g. A Policy oa Geomttric Design of Highways and Streets, Americas Aseociati n of State Highway and <br />Transportation Offimals (AASIiY'O), latest aditton <br />h. Ltstitute of Transportatiott Engineer's Ttip Getteration manual, fith edition <br />i. State Highway Access Code (2 CCR 601-1) <br />j. 12oadway Design Manual <br />Some of the reference materials listed above may be purchased from: <br />Colorado Department oSTranspot1o6on <br />Bid Plans Room <br />4201 Bast Arkansas Avenue <br />Denver, CO 80222-3400 <br />AU materials, •equipment, installation, coasttuction, and design, including auxil lane (s) and the <br />intersection improvements within elan highway right-of-way, shall be in accord ca with the epplioeble <br />CllOT and local jurisdictions standards. <br />16. All work is to conform to the plans referenced by this permit on 51e with the D artrrtettt or as modified by <br /> this permit. (lf discrepancies arise, this permit shall ffiko precedence Duet' the p s.) The Department or <br /> issuing authority plan review is only for general conformattoa with the Depe t'e design and cede <br /> requirements. The Department or issuing authority ie.not responsible for the a cy and adequacy of the <br /> design, dimensions, elevations and other elements which shall be confirmed and omlated at the work site. <br /> The Department, through the approval of this document, essumos no rcaponsibil Por the cotnpleteneae or <br /> accuracy of the plans. <br />19. Survey markers or montmtents must ba preserved in their original positions. No 'fy the Department at <br /> 343 757-9744 immediately upon damage to or discovery of any such markers or nUtnenta at the work site. <br /> Any survey mockers or monunuxtts disturbed during oxtcution of this permit aha ] be repaired andlor replaced <br /> immediately at the expense of the Pcrmittec. <br />20. Construction Plans must be approved by the Colorado Departmettt of Transports 'on, Region One, prior to the <br /> issuance of the Notice w Proceed, <br />21. Signing and Striping Plans must be approved by the Colorado Department of 1Y ortadian, Region One, <br /> prior to the issuance of the Notice to Prooeed. <br />22. 1}affic Control Plans must be approved by the Colorado Department of 7}anspo l otion, Region One, prior to <br /> the issuance of the Notice to Proceed. <br />23. Upon completlon of the work, end no later then 45 calendar days after CDOT'a oject acaoptanae, the <br />