Laserfiche WebLink
<br />Drainage from the southwestern side of the haulage road flows <br />into Harvey Gap Drainage. Erosion is controlled by natural <br />vegetation. <br />C. Outslopes of SP-1: Outfall 005. <br />Sediment Pond 1 (SP-1}, including the outslopes, covers <br />approximately 0.4 acre. Runoff from the outslopes of SP-1 <br />flows into the Harvey Gap Drainage. The outslopes of SP-1 <br />were seeded in March 1986. The seed mix used was the one <br />approved by Colorado Mined Land Reclamation Division and is <br />well established. <br />D. Discharge Structures from SP-1 into Harvey Goo Drainage: <br />Outfall 006. <br />The principle Spillway from SP-1 is a 2" pipe with a valve. <br />It connects with a small ditch that discharges its flow into <br />DD-1 and connects with the Harvey Gap Drainage via a <br />stabilized channel. The outslope of the small drainage ditch <br />,~ is vegetated with the MLR approved seed mix to control run-off <br />and erosion. <br />The SP-1 emergency spillway is about six feet wide and <br />approximately 12.5 feet in length. Drainage from the spillway <br />would flow into DD-1 and then into the Harvey Gap Drainage. <br />Rip-rap 3" to 6" in diameter was placed in the spillway. The <br />SP-1 spillway was seeded with the MLR recommended seed mix in <br />March 1986. The vegetation is well established. <br />A stabilized channel conducts flow from the SP-1 emergency <br />spillway, DD-1, and SP-1 principle spillway to the Harvey Gap <br />Drainage. The stabilized channel is about 7.5 feet wide and <br />approximately 75 feet in length. The channel is stabilized <br />with 8 inch riprap held in place by anchored wire mesh. The <br />channel was seeded in March 1986; the vegetation is well <br />established. <br />E. Outslope of CD-1: Outfall 007. <br />CD-1 begins at the east side of the Haulage Road at the base <br />of the coal processing area. It runs through a culvert <br />underneath the Eaulage Road and along t}:e edge c` `t= <br />disturbed s,:rface area, gad empties into SP-1. The total <br />length o` the C~-i is a~ou~ 650 feet. C7-1 carries water <br />• discharged from the mine as well as run-off collected from the <br />Surface Disturbance areas to SP-1. The width of the outslope <br />of CD-1 varies frcm about one foot to two feet. Ru^^.-off from <br />G <br />