Laserfiche WebLink
1 <br />' MINING PLAN EXBIBIT C (Cont.) <br />1 <br />' any soil encountered will be stockpiled in the northwest corner of <br />the affected lands. This soil will later be moved to the benched <br />' area of use in reclamation. If the soil stockpiles remain undisturbed <br />for more that one growing season a cover crop of western wheatgrass <br />' will be planted on them. <br />Mining will begin on the northern part of the affected lands <br />' and precede to the south. The deposit will be mined by creating <br /> two benches, one bench will be approximately 25 feet from the <br />' surface and the other one being the final floor of the pit. <br />t b <br />kfilli <br />ill <br />il <br />i <br />2h <br />l <br />h <br />b The <br /> e necessa <br />at <br />ac <br />ng w <br />no <br />slopes w <br />l be m <br />ned <br />: <br />y so t ry. <br /> The sand and gravel will be mined with a front end loader, it may <br />' then be moved to a conveyer, screened and loaded out or it may <br /> just be loaded directly in trucks and hauled to another site for <br /> processing. Final processing will be done at the Riverside Pit <br /> MLR Permit NO. M-76-056. On-site equipment may include, but is <br />' not limited to, a motor grader, front-end loader, conveyor, screening <br />plant, dump trucks and a water truck. <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br />1 <br />' 12 <br />