My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114996
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:04 PM
Creation date
11/25/2007 12:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
Permit File
Doc Date
1/10/1995
Doc Name
PATHFINDER PIT FN M-94-113 PRELIMINARY ADEQUCY REVIEW
From
DMG
To
TUTTLE APPLEGATE INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Steve Shuey <br />Division of Minerals & Geology <br />Durango Field Office <br />May 1 S, 1995 <br />Page 2 <br />During periods of temporary cessation any chemical containers, with the exception of fuel tanks, <br />will be removed from the site. The site will be inspected prior to leaving, to determine the need <br />for any additional erosion prevention measures beyond those stipulated in the Stormwater <br />Management Plan (SWMP). The site will be inspected again prior to returning for active mining, <br />to assess any damages to any sediment or erosion control structures and determine the need for <br />additional structures or preventive methods. Based on the inspection, the operator will take <br />appropriate measures, based on the SWMP, to stop any problems and mitigate any potential areas <br />of concern. <br />If operations at the site are stopped for reasons other than the winter season, the same beginning <br />and end inspections will occur, with the addition of inspections on a monthly basis, to assure that <br />there is no environmental degradation occurring. All exposed slopes will be stabilized prior to <br />leaving the site. <br />As requested, the azea occupied by the hydropower conduit within the permit boundary that will <br />not be disturbed by the actual mining of the site is indicated on Exhibits C1 and C2. The <br />applicant is awaze that when an agreement is reached with the hydropower conduit owner and <br />mining of that azea is allowed by the owner, an amendment to the existing permit will be . <br />required. Such an amendment will be sought prior to mining of the area occupied by the <br />hydropower conduit. <br />Structures and Best Management Practices (BMPs) used to control sediment loss from the site <br />are addressed and explained in the Stormwater Management Plan (SWMP) required as a <br />condition of applying for a Stormwater Dischazge Permit. The SWMP is incorporated into the <br />permit application materials by this reference. A copy of this plan is included with this letter. <br />The sediment control structures, however, will not be permanent site features and will be <br />removed upon completion of activities at this site. Therefore, they are not shown on the <br />reclamation plan map. <br />The applicant may in the future have the need for wash facilities. If they are needed, a Technical <br />Revision to the permit will be requested and the design and information of the proposed wash <br />facilities will be submitted to the Division prior to the construction of such facilities. It is not <br />known yet whether wash facilities will be used at this site and the design and details of such aze <br />unwarranted at this point. <br />Spill contairiment information for any hazazdous materials stored on-site is included in the <br />Stormwater Management Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.