Laserfiche WebLink
• D.4.3 Naste Handling and Disposal <br />haste streams for the Pilot Plant operations and their respective disposal <br />areas are presented as follows: <br />Waste Stream Destination <br />Boiler Blowdown <br />Cooling Tower Blowdown <br />Bleed-off Water <br />Process Liquor and Insoluble <br />Filtration Purge <br />Potable Water Treatment Purge <br />Evaporation Pond ql <br />Evaporation Pond ql <br />Evaporation Ponds q2 & q3 <br />Evaporation Pond #1 <br />Evaporation Pond ql <br />• The design details and engineering standards have been previously presented <br />for the evaporation ponds. After cessation of operation, solids in this <br />pond will be removed for disposal at an approved landfill. Solids remaining <br />in the ponds receiving the bleed stream will be sold or disposed of off-site <br />in an approved manner. <br />D.4.4 Sanitary Faci lities <br />A septic system and drainfield will be constructed to receive domestic <br />wastes. This system will be built in conformance with Rio Blanco County's <br />building codes. All trash and garbage generated by the Pilot Plant <br />operation will be collected in covered containers for subsequent off-site <br />disposal at an approved landfill. <br />D.5 MONITORING AND EWVIRONMENTAL PROTECTION STANDARDS <br /> <br />D-12 <br />