Laserfiche WebLink
O.S.`1. CO'IPLIANCE D.A.H. 6/18/79 <br />•IT WORA TO BE DONE ESTIMATED COST <br />~ <br />IB 1 hr. with road grader $ 210.50 <br />2b 2 hr. with backhoe <br /> 6 hts. labor <br /> (Does not include costs <br /> of finishing Nnrris Pond) <br />Ila Estimated 4000 cu. yd. $ 920 <br />la 8 hr. with D8 <br /> 8 hr. with backhoe <br /> (40 hrs. with mine loader <br /> not included in cost) <br />ITAlb 50 hrs. labor $ 650 <br />II 8 hrs. loader $ 672 <br />I 24 hrs. labor <br />II31 2 hrs. with backhoe $ 100 <br /> ('i hour for mine loader <br /> after each train not <br /> included) <br />• II 1Jnrk to be dnnu a.s part of $ 0 <br />B2 unit train construction <br />III 8 hrs. loader $ 800 <br />A 32 hrs. labor <br /> 8 hrs. pickup <br />IITB1 Complete $ 0 <br />III Cost of rock lining ditch <br />B2A not determined. All other <br /> work completed. <br />III Diameter and length not <br />B2b determined <br />III 6 hrs. labor $ 168 <br />B2c 2 hrs. loader <br />IV 'I'o be done by mine personnel $ 0 <br />Ala <br />IVlb 56 hrs. D8 $7260 <br /> 56 hrs. loader <br /> 80 hrs. Labor <br /> 80 hrs. jackleb <br />• <br />Iy 100 yd.3 gob to haul away $ 560 <br />~B 16 hrs. dump truck <br /> nine loader nor. charged <br />2. <br />