Laserfiche WebLink
WESTERN SLOPE CARBON. INC. <br />• <br />I,u NE JfT ICC 5.`~`F R4f. 1, rJL.`H -0I h` ^11.1~ <br />~~~ ~z~ secs <br />Lune i8, 1479 <br />C.S.M. C(1MPT•TANCF. <br />COST I.STIFIATIONS <br />• <br />These cost estirations refer to the items listed on tl~e memorandum of <br />b-10-79. Coasts arc• hased on the fullowing equipm,•rit prices: <br />nR Dozer S65/hr. <br />Roadgrader $32.50/h r. <br />Eackhoe $50/hr. <br />Front-end Loader $50/h r. <br />Dump Truck $35/hr. <br />Pick-up Truck $2G/day <br />Jack-Ieg Drill $12.50/day <br />Labor $13/hr. <br />ITEM <br />IAI <br />W(•RK TO BE DONE <br />8 hrs. for dump truck <br />2 hrs, for front-end loader <br />2 hrs. for laborer <br />ESTIPIATED COST <br />$ 396 <br />IA2 <br />IA3 <br />I.~ , <br />Y <br />IBI <br />IB2A <br />Sell for scrap <br />2 hrs. for front-end loader <br />2 hrs. for laborer <br />Part of A 6 G Silo work <br />Complete <br />b hrs. labor each culvert <br />2 hrs. backhoe <br />4 hrs. front-end loader <br />2 hrs. road grater <br />$ 0 <br />$ 116 <br />$ 0 <br />$ Q <br />$5 79 <br />A rU~11 DIART OI NORTNW[[T CN[RGT COMIANY <br />