Laserfiche WebLink
~S.M. COMPLIANCE D.A.H. 6/18/79 3. <br />ITEM WORK TO BE DONE ESTIMATED COST <br />IVAZb To be done with eater $ 0 <br />tank job. <br />IVBla Complete $ 0 <br />IVBib 8 hrs. labor $ 104 <br />IVBlc Complete $ 0 <br />T?'yld 16 hrs. Iabor 5 ZOS <br />IVBIe 16 hrs. D8 $1040 <br />IVB~a 4 hrs. road grader $ 130 <br />IV2b Complete $ 0 <br />IVB3a Not determined <br />.L'E.Sb h hrs. labor $ 168 <br />2 hrs. loader <br />LVB3c Complete $ 0 <br />IVB4a 8 hrs. DB $ 520 <br />iVB4b Complete $ 0 <br />IVBSa D8 2 hrs. $ 230 <br />Backhoe 2 hrs. <br />I1'plb D8 6 hrs. $ 390 <br />I?'B6 6 hrs. labor <br />TOPSOIL AND SEEDING COSTS ~5 1 21 <br />Basis of estimates <br />1. Seed costs <br />a. Flat areas $35.01 per acre <br />• b. Slope areas 540.51 per acre <br />c. 16 hrs. labor 5708 per acre <br />X /•3 <br />1967 5 <br />