Laserfiche WebLink
rial will be recycled through the asphalt plant. Also, the Division will be notified in case of any <br />spills on site. The portable mining equipment such as loaders, dozers, tracks and excavators will be <br />serviced on an as-needed basis from portable service truck making short visits to the site. Upon <br />reclamation, all portable equipment will be removed from the site. <br />Power is available from poles at the northern side of the permit area or power may also be supplied <br />from diesel generators using the tanks described above. There will be no fence around the opera- <br />tion, since it is inside private property and protected by berms and fences along the FMM property <br />boundary. No problems are expected with vandalism. <br />The operator commits to clearly marking the permit boundary with stakes surveyed on site. <br />The site will use all existing roads to haul the product to its final destination. It is planned that the <br />material may be used to re-surface existing roads, make asphalt or provide new road base for any <br />new roads within an economic distance to the site. <br />In addition to the facilities listed above, the following are also ancillary to the mining and process- <br />ing activities: <br />* Parking for workers <br />* Portable office and lab <br />* Equipment storage and maintenance <br />* Portable toilets <br />* Portable fuel and water storage <br />* Stockpiling and processing of used asphalt & concrete for recycling <br />All of these items will be placed in the staging area, as shown on Map C-2. There will be no perma- <br />nent storage of oil, fuel or hazardous material within the permit boundary. Since the storage of these <br />products is temporary, an impervious liner will be installed beneath earthen containment dikes. <br />Dikes will be constructed in a fashion to contain at least 110 percent of the volume of the largest <br />storage vessel within the containment area. <br />Operations within the pit area will generally be limited to the hours of 6:00 A.M. to 7:00 P.M. and <br />will occur intermittently throughout any given year. <br />Gilsonite Pit 10/02 12 <br />