Laserfiche WebLink
Section 780.271b1 Continued. <br />The monitoring frequency for the remaining postmining discharge points will continue <br />to be weekly during March, April, May, and June and monthly during July, August, <br />September and October. Kerr proposes, for the surface water sites at the mine area <br />and Loadout, to analyze for postmining parameters as required by the CDPS permit <br />which include: <br />Postmining Parameters <br />• Flow, MGD <br />• Settleable Solids, mg/I <br />• pH, s.u. <br />• Oil and Grease, mg/I <br />The surface water monitoring stations remaining in the monitoring program are shown <br />on Map 48, Mine Areas Monitoring Stations and Map 36, Kerr Tipple Area Postmining <br />Topography. Monitoring requirements are summarized by Table 61, Kerr Mine Area <br />Hydrologic Monitoring Schedule. <br /> <br />I • <br />TR-19 780-109b Revised 11/98 <br /> <br />