My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114146
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:18 PM
Creation date
11/24/2007 11:20:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007050
IBM Index Class Name
Permit File
Doc Date
7/24/2007
Doc Name
New Appl.
From
Yocam Stone LLP
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The costs of spreading plant growth medium, seeding, and hydromulching have been <br />estimated using cost summary from the Canyon Rim Stone Quarry <br />Estimated Reclamation Costs for 9.6flcres ofthe Bu,~alo Stone Quarry -Using the <br />cost summary form from Canyon Rim Stone Quarrypermit. <br />Item <br />Costs <br />Mobilization (equipment and personnel) $ <br />Revegetate mine site $11,296.00 <br />Backfill pit with fines, waste rock & top soil $12,140.00 <br />Liability insurance $502.00 <br />Performance bond $261.00 <br />Total Estimated Reclamation Costs $25, 618.00 <br />6.3.5 EXHIBIT E -Map <br />1 Ma s <br />The Mining Map and the Reclamation Map aze provided at a scale as shown on the <br />map, and the maps include a north arrow, pertinent comers, and the date prepazed. <br />(2} Quarr~g Plan Map <br />• (a) The Pernut Boundary for the Buffalo Stone Quarry is shown as the affected area. <br />(b) The applicants are the owners of record within 200 feet of the affected area; <br />the Yocam's own the mineral rights. <br />(c) All major surface features to be used in connection with the proposed operation aze <br />shown. <br />(d) The direction that construction material extraction will proceed as shown on the Mining <br />Map Exhibit E-2, and is described in Section (~ Disturbances under Exhibit C-Mine Plan <br />above. <br />(e) There is a stock pond approximately 100 feet on the west side of the quarry. <br />(f) Existing disturbance associated with the Buffalo Stone Quarry consists of a ranch <br />road which will not be reclaimed and pre-law mining disturbance which will be <br />incorporated into the proposed operation and reclaimed as described in Exhibit D. <br />(3} Reclamation Plan Map <br />(a) Gradient of all reclaimed slopes is shown on the Reclamation Map, but will be <br />held to less that 3H:1 V. <br />(b) The entire quarry wilt be vegetated. Shrubs and trees will not be planted as the <br />area is grazed by livestock and shrubs and trees will not likely survive the grazing <br />
The URL can be used to link to this page
Your browser does not support the video tag.