Laserfiche WebLink
<br />11. The gravel will be processed on site unless sold as pit run <br />in which case it will not be processed at all. In this pit, <br />there will 6e no asphalt miring, no concrete plant, and no <br />washing of the gravel at the present time. The only processing <br />will be crushing and screening. The crushing plant consist~~ of <br />a primary end a secondary crusher, screening plant, and <br />[onveyors necessary for moving and stockpiling the material. No <br />chemicals will be used in the process; therefore, the natural <br />hydrologic and ecologic balance of the area will not be <br />disturbed. Pecause no water nor chemicals are being used, there <br />should be no off-site disturbances or damage. <br />• <br /> <br />