Laserfiche WebLink
As mining continues, the refuse area will expand. Yore topsoil <br />A will be stripped and gradually the Reton Crcek No.2 Minc area and highwall <br />-- will be reclaimed by the advancing refuse. The cross sections of <br />Exhibit D show the topography before and during mine operation <br />and also after reclamation. <br />+~ <br /> <br /> <br />347 <br />Revised 5/93 <br />