Laserfiche WebLink
BIT D <br />PLAN <br />• <br />• <br />• <br />Mining (cont.) <br />thin bed seams. This machine utilizes a revolving cutting <br />remove the rock as opposed to drilling and blasting. <br />Water Control <br />There is indication from the exploration drilling that <br />be encountered midway of the development phases. If this oc <br />it will be pumped to a surface pond where it will be evapora <br />approximate location is shown on the map in Exhibit C. Sho <br />necessary, Cotter will apply for an additional discharge po <br />an existing NPDES permit (JD-9). <br />to <br />ter will <br />ors, <br />d. An <br />' it become <br />under <br />Ventilation <br />During the enlarging of the existing adit and the drivin of the <br />development drift, `resh air will be deI_'vered by a 50 BP fan to the <br />working face via a 30 inch diameter ventilation tube. As <br />continues on the drift parallel to the Opera Box Claim, a dr <br />be driven into the old workings for ventilation and as a se <br />escapeway. Auxillary ventilation systems will be set up in t~ <br />as required. the ventilation boreholes will be upreamed as ne <br />Levels of radon gas concentrations will be monitored and <br />kept in accordance with MSBA regulations. <br />Ore Deposit Information <br />Uranium and Vanadium mineralization occur as roll and <br />-3- <br />~elopment <br />'t wi 11 <br />~ndary <br />ie stopes <br />cessary. <br />records <br />ular <br />