Laserfiche WebLink
<br />100 feet of <br />mining activities <br />Relocating the public road. <br />RESPONSE: Refer to Permit No. C-81-071 <br />(4) Ponds, impoundments and diversions <br />• to 2.10, and cross-section of the structure and its location- <br />(C) Contain orelinlinarv hydrologic and gaol <br />each <br />(B) Include anY geotechnical investigation, design, <br />and construction requirements- <br />SC) Describe the operation and maintenance <br />requirements for each structure; and <br />(D) Describe the timetable and plans to remove each <br />structure, if appropriate. <br />• <br />-32- Revised 12/22/86 <br />Each general plan shall: <br />(ii) Each detailed design plan for a structure shall: <br />