Laserfiche WebLink
C. Reclamation <br />• 1. Spoil Grading (Out of Area) <br /> 6 acres = 6 hrs <br /> 1 acre/hr <br /> 6 hrs X $68.01 = $ 408.00 <br /> 2. Topsoil Redistribution <br /> 14,520yd3 = 10 hrs <br /> 1,444 LCY/hr <br /> 10 hrs X $102.99 = $ 1,030.00 <br /> 3. Revegetation <br /> 6 acres X $611/acre = 5 3,666.00 <br /> $ 62,709.80 <br />COST SUMMARY <br />Area 7 $ 62,641.00 <br />Area 31-1 & 31-2 $ 126,515.00 <br />Area 41 $ 156,235.00 <br />• Area 51 $ 65,515.00 <br />Area 51E $ 67,710.00 <br />(say) <br />10% Administration Fee <br />• - 5 0 - <br />478,616.00 <br />478,600.00 <br />47,860.00 <br />$ 526,460.00 <br />Revised 07/29/88 <br />