Laserfiche WebLink
B. Riprap and bedding haul placement <br />1. Riprap <br /> 2,100yd3 X $40/yd3 = $ 84,000.00 <br />2. Bedding <br /> 820yd3 X $18/yd3 = $ 14,760.00 <br />C. Recl amation <br />1. Spoil Grading (Out of Area) <br /> 21 acres = 21 hrs <br /> 1 acre/hr <br /> 21 hrs X $68.01 = $ 1,428.00 <br />2. Topsoil Redistribution <br /> 50,820d3 <br /> = 35 hrs <br /> 1,444 LCY/hr <br /> 35 hrs X $102.99 = $ 3,605.00 <br />3. Revegetation <br /> 21 acres X $611/acres = $ 12,831.00 <br />• $ 156,235.00 <br />IV. Area 51 <br />A. Site Preparation <br />1. Topsoil Salvage <br /> 2.4-r286yd-3 = 17 hrs <br /> 1,444 LCY/hr <br /> 17 hours X $102.989/hr = $ 1,751.00 <br />2. Spoil Grading (Into Area) <br /> 10 acres = 10 hrs <br /> 1 acre/hr <br /> 10 hrs X $68.01 = $ 680.00 <br /> 11 hrs X 5102.99 = $ 1,133.00 <br />B. Riprap and bedding haul placement <br />1. Riprap <br /> 1,135yd3 X $40/yd3 = $ 45, 400.00 <br />2. Redding <br /> 445yd3 X $18/yd3 = $ 8,010.00 <br /> <br />- 48 - Revised 05/26/87 <br />