Laserfiche WebLink
• 2. Spoil Grading (Into Area) <br /> 11 acres = 11 hrs <br /> 1 acre/hr <br /> 11 hrs X $68.01 = $ 748.00 <br /> B. Riprap and bedding haul placement <br /> 1. Riprap <br /> 2,435yd3 X $40/yd = $ 97,400.00 <br /> 2. Bedding <br /> 955yd3 X $18/yd = $ 17,190.00 <br /> C. Reclamation <br /> 1. Spoil Grading (Out of Area) <br /> 11 acres = 11 hrs <br /> 1 acre/hr <br /> 11 hrs X $68.01 = $ 748.00 <br /> 2. Topsoil Redistribution <br /> 26 <br />620d3 <br /> , <br />= 18 hrs <br /> 1,444 LCY/hr <br />• 18 hrs X $102.99 = $ 1,854.00 <br /> 3. Revegetation <br /> 11 acres X $611/acres = $ 6,721.00 <br />$ 126,515.00 <br />III. Area 41 <br />A. Site Preparation <br />1. Topsoil Salvage <br /> 50,820yd3 35 hrs <br /> 1,444 LCY/hr <br /> 35 hours X $102.989/hr = S 3,605.00 <br />2. Spoil Grading (Into Area) <br /> 21 acres = 21 hrs <br /> 1 acre/hr <br /> 21 hrs X $68.01 = $ 1,428.00 <br />3. Material Haul to Area 51 <br /> 70,000yd3 <br /> = 68 hrs <br />3 <br /> /fleet hr. <br />1,026 yd <br />• 68 hrs X $:69.50 X 3 = $ 34,578.00 <br /> - 47 - Revised 05/26/87 <br />