My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112237
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:38 PM
Creation date
11/24/2007 9:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PR2 RULE 2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2. Spoil Grading (Into Area) <br /> 11 acres = 11 hrs <br /> 1 acre/hr <br /> 11 hrs X $68.01 = $ 748.00 <br /> B. Riprap and bedding haul placement <br /> 1. Riprap <br /> 2,435yd3 X $40/yd = $ 97,400.00 <br /> 2. Bedding <br /> 955yd3 X $18/yd = $ 17,190.00 <br /> C. Reclamation <br /> 1. Spoil Grading (Out of Area) <br /> 11 acres = 11 hrs <br /> 1 acre/hr <br /> 11 hrs X $68.01 = $ 748.00 <br /> 2. Topsoil Redistribution <br /> 26 <br />620d3 <br /> , <br />= 18 hrs <br /> 1,444 LCY/hr <br />• 18 hrs X $102.99 = $ 1,854.00 <br /> 3. Revegetation <br /> 11 acres X $611/acres = $ 6,721.00 <br />$ 126,515.00 <br />III. Area 41 <br />A. Site Preparation <br />1. Topsoil Salvage <br /> 50,820yd3 35 hrs <br /> 1,444 LCY/hr <br /> 35 hours X $102.989/hr = S 3,605.00 <br />2. Spoil Grading (Into Area) <br /> 21 acres = 21 hrs <br /> 1 acre/hr <br /> 21 hrs X $68.01 = $ 1,428.00 <br />3. Material Haul to Area 51 <br /> 70,000yd3 <br /> = 68 hrs <br />3 <br /> /fleet hr. <br />1,026 yd <br />• 68 hrs X $:69.50 X 3 = $ 34,578.00 <br /> - 47 - Revised 05/26/87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.