Laserfiche WebLink
COST ESTIMATE BY AREA <br /> I. Area 7 <br /> A. Site Preparation <br /> 1. Topsoil Salvage <br /> 21,780yd3 15 hrs <br /> 1,444 LCY/hr <br /> 15 hours X $102.99/hr = $ 1,544.00 <br /> 2. Spoil Grading (Into Area) <br /> 9 acres = g hrs <br /> 1 acre/hr <br /> 9 hrs X $68.01 = $ 612.00 <br /> B. Riprap and bedding haul placement <br /> 1. Riprap <br /> 1,125yd3 X $40/yd = $ 45,000.00 <br /> 2. Bedding <br /> 435yd3 X $18/yd = $ 7,830.00 <br /> C. Rec lamation <br />• 1. Spoil Grading (Out of Area) <br /> 9 acres = g hrs <br /> 1 acre/hr <br /> 9 hrs X $68.01 = $ 612.00 <br /> 2. Topsoil Redistribution <br /> 21,780yd3 = 15 hrs <br /> 1,444 LCY/hr <br /> 15 hrs X $102.99 = $ 1,544.00 <br /> 3. Revegetation <br /> 9 acres X $611/acres = $ 5,499.00 <br />$ 62,641.00 <br />II. Area 31-1 and 31-2 <br />A. Site Preparation <br />1. Topsoil Salvage <br />26,620yd3 18 hrs <br />1,444 LCY/hr <br />• 18 hours X $102.99/hr = $ 1,854.G0 <br />- 46 - Revised 05/26/87 <br />