Laserfiche WebLink
MCC will construct two temporary collector roads and six temporary spur roads <br />in 2002. These roads aze Sylvester Road, Long Draw Saddle Road, Draw Spur No. 1, <br />Draw Spur No. 2, 16-08 Spur, 17-O1 Spur, Saddle Spur, and 17-07 Spur. <br />Road Name <br />Sylvester <br />Long Draw Saddle <br />Draw Spur No. 1 <br />Draw Spur No. 2 <br />16-08 Spur <br />17-O1 Spur <br />Saddle Spur <br />17-01 Spur <br />17-07 Spur <br />Leneth Access to <br />1.1 mi West Flatiron Road <br />0.4 mi reconstructed Long Draw Saddle Rd. <br />0.6 mi ~ 16-02, 16-03,17-03 <br />0.6 mi 16-O1, 17-02 <br />0.1 mi 16-08 <br />0.1 mi 17-01 <br />0.6 mi 17-OS <br />0.1 mi 17-01 <br />0.1 mi 17-07 <br />The approximate temporary road and drill pad locations are provided on the <br />attached Map 3. MCC will field locate the road aligrunents and pad locations prior to <br />construction for review and approval by the responsible USFS representative. <br />MCC will provide under a sepazate submittal a road design, specifications, and <br />expected use standazds as required by the USFS and CDMG for Sylvester Road. <br />MCC requests the ability to use pickup trucks, ATVs, snowmobiles, snow cats, <br />for primary access to the project area. Heavy equipment including but not limited to <br />bulldozers, dump trucks, backhoes, track hoes, water trucks, maintainers, will be utilized <br />to construct and maintain the roads during the field season. <br />MCC will construct the temporary roads, culverts, rolling dips, gravel, MUTC <br />signs, gates, and other mitigation measures as defined in the field with the responsible <br />USFS representative. <br />9 <br />