My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112136
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:34 PM
Creation date
11/24/2007 9:12:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
7/15/2002
Doc Name
Annual Operating Plan 2002 - Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR96
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRE-DRILLING ACTIVITIES <br />MCC incorporates by reference the Forest Service Decision Notice dated May 31, <br />2002, titled Coal Methane Drainage Project Panels 16-24 Mountain Coal Company West <br />Elk Mine. <br />Prior to any construction or drilling activities, an on-site inspection of proposed <br />drill sites and access routes will be conducted with representatives from appropriate <br />regulatory agencies to discuss site-specific concerns. Appropriate Road Use and Special <br />Use permits will be obtained prior to use of US Forest Service roads. <br />USFS regulatory personnel will be notified at least 48 hours before any <br />construction or drilling equipment is mobilized into the project azeas. All construction <br />and drilling activities will be supervised by an authorized representative of MCC. A copy <br />of the Annual Operating Plan and all pertinent permit documents will be available from <br />the company representative for inspection. Any proposed changes in the Annual <br />Operating Plan after approval will be reviewed with the appropriate regulatory agencies <br />before changes take effect. <br />In accordance with the Conditions of Approval, Administrative #2, the staging <br />azeas to be used by the drilling contractor will be reviewed with and approved by the <br />USFS District Ranger or designated representative prior to use. These sites will be used <br />in a manner to minimize damage to [he vegetation. Any surface disturbance to these sites <br />will be regraded and seeded to facilitate rehabilitation. <br />Access to all drill sites and water lines will use the existing roads and trails <br />approved in the Decision Notice will be used whenever possible. All access routes will <br />be maintained to accommodate 4X4 pickup trucks and a drilling unit. A drilling unit is <br />comprised of or part of the following equipment: truck mounted or skid mounted drill rig, <br />air compressors, air boosters, rig-up truck, boom truck, utility trailers, fuel skidders, drill <br />pipe laydown rack, crew trucks, and water trucks. <br />NEW ROAD CONSTRUCTION <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.