Laserfiche WebLink
WATER SUPPLY SYSTEM <br />MCC will be installing and maintaining a water supply system to provide water to <br />the drill sites and for dust suppression activities. This system will minimize to an lazge <br />degree the need for water skidders and water trucks to travel the temporary roads. The <br />water supply system will include, but is not limited to, flexible hosing, rigid piping, water <br />pumps, and storage tanks. <br />MCC will install the water supply system prior to, or as soon as possible after the <br />construction of the drill pads. Intermediate use of water trucks to initiate the start of hole <br />drilling may be required. The hosing and /or pipes will be placed along side of existing <br />roads wherever practical. The lines will be anchored to prevent damage due to surging in <br />the lines. Flexible hosing will be laid out cross country to minimize total line length <br />and/or to maximize operational efficiency of the system. Cross country routes from16-07 <br />to 17-08, from 16-02 to 16-01, and from 17-02 to 17-O1, are anticipated. MCC requests <br />the use of off-road ATV access along the water line routes to install, maintain, and <br />recover the lines. <br />The main waterline system will temporarily utilize the existing line in Sylvester <br />Gulch until Sylvester Road is constructed and the waterline installed along the roadway. <br />MCC anticipates the re-rout of the Sylvester Gulch line prior to the 2003 drilling season. <br />The line that follows West Flatiron Road will be extended along Long Draw Road to a <br />staging azea at drill site 16-05. Single or dual frac tanks and pumps will be situated at this <br />site to distribute the water to the holes east of the location including 16-01, -02, -03, -04, <br />17-01, -02, and -03. A sepazate line will extend south from the frac tanks at 16-OS to <br />provide water to 17-07, -06, -O5, and -04. A tee off the mainline at Sylvester Gulch - <br />West Flatiron Road junction will provide water to 16-07, -08, and 17-08, -09. <br />The approximate waterline, pump, and frac tank locations aze provided on the <br />attached Map 4. MCC will field locate the waterline alignments prior to installation for <br />review and approval by the responsible USFS representative <br />13 <br />