Laserfiche WebLink
STAGING AREAS <br />MCC will utilize existing and to be constructed drill pad locations for staging <br />azeas. The staging areas will allow MCC to temporarily store equipment and supplies <br />used in the drilling and venting programs. The ability of store items such as casing, drill <br />pipe, and methane exhausters close to the work azeas is beneficial to both the USFS and <br />MCC. During inclement weather periods, access on the temporary roads with heavy loads <br />is difficult, dangerous, and time consuming. Having the material close at hand will <br />minimize road damage and delays to the drilling. <br />Surplus supplies, debris, and equipment will be removed from the staging azeas <br />once it is no longer needed. Winter time storage of supplies including waterline, casing, <br />valves, and fittings is requested. The location of the winter time staging azea storage site <br />will be determined with the responsible USFS representative. <br />MCC proposes the following existing and to be constructed sites as staging azeas: <br />14-06 <br />15-OS <br />16-03 <br />16-OS <br />16-07 <br />17-06 <br />The requested staging area locations are provided on the attached Map 5. MCC <br />will field locate the staging azeas with the placement of the drill pads with approval by <br />the responsible USFS representative <br />14 <br />