Laserfiche WebLink
~II. 2.05.4(2)(b) - Reclamation Costs - Reclamation Plan <br />A. Hourly Equipment and Ooerator Costs <br />The hourly earthmoving equipmen*_. costs presented in Section 4.8 of <br />the renewal application should be updated to reflect 1986 Blue Book <br />rates. The chart below shows the most recent hourly rates for the <br />various pieces o_' earthmoving equipment used by the applicant in <br />estimating backfilling and grading costs. <br />Equipment Monthly Location Hourly Operating Operator <br />Make & Model Rate(2) Adjustment Rate() Costs($) f.$)** Totai($) <br />Cat D-9L 16,775* 1.09 102.94 44.20* 14.35 161.49 <br />CAT 637D-PP 23,255 1.08 142.70 68.75 14.49 225.94 <br />CAT 16-G 11,405 1.08 69.98 26.95 14.35 111.28 <br />* Includes adjustment for "U" blade attachment. <br />** Operator wages were obtained from the May 6, 1996 open shop minimum <br />wage rate schedule utilized by the estimating branch of the Colorado <br />Department of Highways. Wage rates used by the Highway Department are <br />developed from a U.S. Department of Labor Document entitled "Minimum <br />Wages - Colorado - U.S. Department of Labor - Heavy and Highway <br />Construction - Statewide". The following is a breakdown of operator <br />• wages fcr the types of equipment used Suring reclamation. <br />F. I . C. P.. Open <br />Equipment Base Unempl.& Liab. Ins. shop <br />Type Rate() Fringes($) Workmen's Comp. Mult. ^•otals($) <br />dozers motor graders 12.41 3.70 3.03 .75 14.35 <br />loaders, scrapers 12.56 3.70 3.06 .75 14.49 <br />haul truck 15.06 3.19 3.78 .75 16.52 <br />A REVISED SET OF PONDING CALCULATIONS ARE ENCLOSED WITH THE APPROPRIATE CO5T <br />CHANGES AS REQUESTED. THE ENTIRE SECTION 4.8 'r.A5 BEEN REPRODUCED ANU !.tAY PE <br />SUBSTITUTED DIRECTLY INTO THE PERMIT FOR THE EXISTIPJG SECTION 9.9. <br /> <br />