<br /> <br />Mrs. Ruth Gray - 4 - May 18, 1988 <br />(3) The Mine Plan Maps should be revised to more clearly show the locations <br />of the main access roads, the roads from each pit to the topsoil and <br />overburden stockpiles, and the proposed permit boundary. It will be <br />necessary to submit one map which depicts this information for both pit <br />areas. <br />Exhibit D - Mining Plan (2.12(4)) <br />The mining plan must address the requirements of Rule 2.12(4). For purposes <br />of the 112 permit application, it may be advantageous to describe the <br />operations in each pit as separate phases of operation. An example of a <br />phased mining approach is that in Phase I you would mine the Hawk Pit while <br />temporarily stabilizing the Shaffer Pit with a cover crop. In Phase 2 you <br />would mine the Shaffer Pit while concurrently reclaiming the Hawk Pit. In <br />Phase 3 you would complete all reclamation tasks at both sites. <br />~ ~~ (1) Please describe the method of mining to be employed, including methods of <br />topsoil and overburden removal, method of gravel removal, and the size of <br />.,the area to be disturbed at any given time. <br />)l~%".~ <br />,~, /t~ (2) Please submit a timetable to help describe the operation in terms of the <br />~r estimated period of time required for completion of each phase. If the <br /> phased approach is not used, please describe the sequence of mining <br /> operations in each pit. Wi11 both be mined concurrently or in <br /> sequencel Describe the size and location of each area worked during <br /> each phase of operation. Describe the sequence in which each stage or <br /> phase will be carried out. <br />f <br />~ <br />~ <br />,~.t <br />-,q <br />~ (3) Please state whether the highwalls at each site will be mined as vertical <br />(z faces (as they currently exist) or as a sloped face. <br /> Exhibit E - Reclamation Plan (2.12(5)) <br />r` '(1) Given that there may be highwalls at each pit area which may be 30 feet <br />o in height, please confirm that the post mining land form will have an <br /> average gradient of 5h:ly. <br /> <br />d vi (2) Please specifically state what the slope gradient of the final highwalls <br /> nrl will be upon the completion of reclamation activities. <br />~ <br />G <br />S~ <br />c~ <br />~~ <br />r (3) Please address the potential need for creating drainage channels to <br /> minimize soil erosion. <br /> <br />,((, ~. (4) Please confirm that all access roads and the overburden topsoil stockpile <br />6 areas will be ripped and seeded following the completion of mining. <br />~tl~ <br />n1 <br />~cG,~jt ~ (5) Please confirm that the topsoil stockpile will be stabilized as per the <br />~~, P~ ~ •' SCS recommendations. <br /> <br />