My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111348
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:55 PM
Creation date
11/24/2007 8:30:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
10/10/2002
Doc Name
Weekly Construction Summaries
From
CCV
To
DMG-BK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Phase IVb Weekly Summary No. 1 Page 2 003-2203 <br />on the Phase III ore slope <br />Ames continued cleazing and grubbing in Phase IVb on Substation Hill. Topsoil was stripped and <br />stockpiled locally in preparation for relocation to a permanent topsoil stockpile. Ames hauled <br />oversize material from the Phase IVb area to an uncontrolled fill site and deleterious material to <br />Upper Arequa Gulch. <br />Ames continued construc$on of the Leak Detection Trench (LDT) in Phase IVb along the North slope. <br />Ames constructed approximately 500 feet of LDT. <br />Ames completed placement of DCF over previously deployed geomembrane at the PSSA west end <br />berm. <br />Ames resumed underdrain construction by constructing Secondary and Tertiary underdrains near the <br />new LOB. Ames constructed approximately 120 feet of Secondary underdrain and approximately 80 <br />feet of Tertiary underdrain. <br />Ames resumed DCF removal from the edge of the Phase fVb liner in preparation for Bedding Fill <br />placement. <br />Ames performed excavation remediation activities for underground working UG-493. This working <br />was observed and verified to be "Deep" as defined in the drawings and will be remediated accordingly. <br />Ames resumed placement of Concrete Plug (CP) concrete into "Deep Shaft" UG-493. Ames placed <br />three feet of concrete in accordance with IFC Drawing 12, Detail 1. <br />Ames placed Cemented Rockfill (CR) at UG-493 and UG-263 by tapering the workings and placing 7 <br />feet of CR in accordance with 1FC Drawing 12, Detail 1.. <br />Ames continued placement of Coazse Shaft Backfill (CSB) into "Deep" underground working UG-493. <br />Ames continued placement of Select Structural Fill (SSF) into UG-481. <br />Phase IVc <br />Ames performed confirmatory drilling activities associated with the Phase IVc construction azea on <br />underground working UG-274. <br />Ames performed excavation remediation acfivities for underground workings UG-274, UG-279, and <br />UG-270. These workings were observed and verified to be "Shallow or Deep", as defined in the <br />drawings, and will be remediated accordingly. <br />Ames placed Cemented Rockfill (CR) at UG-275 and UNK-08 by tapering the workings and placing 7 <br />feet of CR in accordance with IFC Drawing 12, Detail 1. <br />Phase Nbl Aug30.5ept14.doc Golder Associates Inc. <br />