My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111348
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:55 PM
Creation date
11/24/2007 8:30:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
10/10/2002
Doc Name
Weekly Construction Summaries
From
CCV
To
DMG-BK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OCT 1 0 2~D2 <br />W~lll~ <br />1~.SSOClc'1feS <br />Golder Associates Inc. <br />Division of d7inawis and Geology <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />September 17, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. l: August 30 through September 17, 2002 <br />Cresson Project Phase 1Vb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of August 30s' <br />through September 17's, 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 39° F to 55° F, and highs ranged from 49° F to 84° F. Rain was recorded <br />on September 9's, 10's, 12a', and 13a`, 2002. Weather observations were made on ten days of this <br />sixteen day reporting period. <br />Construction Svnoosis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on ten days of this sixteen day <br />reporting period {August 30"', September 3'~ through September 6'~, and September 90' through <br />September 13'~. <br />Phase IVb <br />Ames continued to haul and place Soil Liner Fill (SLF) in the Phase IVb PSSA <br />No geomembrane was deployed in Phase IVb during this reporting period. <br />Ames continued placement of Stnachiral Fill (SF) in the Phase IVb azea. Ames placed SF at the Phase <br />IVa/IVb tie-in and above the Phase IVb sump. Ames also continued slope recontouring in the Phase <br />IVb azea on Substation Hill, on the northern PSSA slope, in the PSSA IIoor, on Chicken Hawk Hill, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.