Phase IW Weekly Summary No. 1 Page 3 003-2203 <br />Field Monitoring and Testine Activities <br />Golder observed construction activities associated with Phase 1V earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />azeas was observed. Golder observed Structural Fill (SF) placement in Phase FV for lift thickness, <br />moisture content, and compactive effort. <br />Golder observed placement of SLF in Phase IVb for subgrade preparation, thickness, and materials. <br />Golder observed and documented excavation and remediation activities associated with the Phase IV <br />underground working construction. Workings were designated as Shallow or Deep as defined in the <br />drawings. <br />Golder observed placement of SSF, CSB, CP, and CR for underground working remediaion. These <br />materials were placed in accordance with the drawings and specifications into excavated or open <br />underground workings. Golder previously obtained samples of SSF, CSB, CR, and CP for laboratory <br />testing. Materials supplied met specifications. Terracon conducted field testing and sampling of CP <br />concrete as per specifications, and will supply 28-day strength results. <br />Golder observed and documented confirmation drilling activities associated with the Phase N <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />including logging holes, mazking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Golder visually observed the placement of DCF in the Phase IVb area. Golder had one CQA monitor <br />per dozer to observe DCF placement. <br />Golder provided full time observation of DCF removal along the edge of the Phase IVb liner. <br />Golder marked any liner damage that occurred outside of the overlap. <br />Golder observed construction of LDT in Phase IVb for trench dimensions, slope, and materials used. <br />Golder observed construction of Secondary and Tertiary underdrains for proper trench dimensions, <br />slope, materials, geotextile over-lap, and material thickness. <br />Laboratory Tests <br />Golder obtained one sample of Structural Fill (SFb-12) and one sample of Underdrian Fill (UFb-02) <br />for laboratory testing. The samples tested met the requirements of the specifications and results are <br />presented in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractors meetings on September 3rd and l0a'. Items discussed included <br />rt,,,e,vn,.a,~o-sRaad~ Golder Associates lnc. <br />