Laserfiche WebLink
<br />Mr. Roy D. Blagg -2- February 4, 1483 <br />Exhibit A <br />The existing legal description for this operation was for the original <br />56.13 acres. Please provide either a metes and bounds description of all <br />' 83 acres or a description to the nearest quarter quarter sections for the <br />entire 83 acres. This includes the 3 acres of haul roads to be <br />constructed. This is tF~e legal description that will appear on your <br />warranties and permit. <br />Exhibit C <br />~/ 1. What is the scale of the Area B map showing the location of fixed <br />J~ equipmentl <br />2. The measurements for the relative boundaries of Areas A and B <br />either as labelled or a<_• taken off the map by measuring with a ruler do <br />not give the relative acreages for each area as given. Please correct <br />the map. <br />X3. Contours (both present and final) for Area 8 should be shown. <br />4. The map should show all of those items listed under Rule 2.12(3). <br />Please review this rule and provide the items that are not shown. <br />Exhibit D <br />~l. What is the depth and thickness of the gravel that is to be mined? <br />2. A more precise description of the staging of the mining should be <br />given, with descriptions given of areas of major, moderate, and minor <br />X disturbance (in all three areas of the operation) as per Rule 2.12(4). <br />This will be needed in order to give a precise estimate of the <br />reclamation costs and required amount of the financial warranty. <br />3. All topsoil stockpiles left for one growing season or longer should <br />be planted with a perennial grass cover crop for purposes of <br />stabilization. I suggest Western wheatgrass at a broadcast rate of 6.0 <br />lbs. PLS/acre. <br />4. The staff recommends stripping, stockpiling, and planting topsoil <br />from all affected land (e.g., mining areas, roads that will be reclaimed <br />by seeding, plant areas in Area B). All topsoil stockpiles should be <br />shown on the mining plan map. <br />X 5. What is to be the typical working face slope? <br />Exhibit E <br />X 1. How are the three acres of road easement to be reclaimed? <br />