Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRGPFR - f1Nl Y WORK <br />Agency or organization name :DMG <br />Task # : OSa State :Colorado PermiUjob # : M-2006-028 <br />Date : 07/31/2006 County :Delta Abbreviation :none <br />User : SSS Site :Reynolds Pit Filename : M028-05a <br />Permit or other job action :New 112c Application <br />Task description :Replace overburden on max 1 acre south parcel disturbance <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 (2001) Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cost/hour : $81.70 NA Weight (UST) : 56.34 <br />Operating cosUhour : $114.18 100 Cost data source : (CRG) <br />Operator cosUhour : $24.95 NA <br />Total unit cosUhour : $220.83 Total fleet cosVhour : $220.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,873 CCY factor: 1.110 volume: 9,849 LCY <br />Source of quanfity take-off :Assume 1 acre backfilled fo a depth of 5.5 feel <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Hauling Caoaciri <br />Scraper Payload (weight) Basis : ~ Scraper Bowl (volume) Basis <br />Material weight: 2,800 pounds/LCY <br />Material description <br />Clay -Natural bed <br />Rated payload : 82,000 pounds <br />Payload capacity : 29.29 LCY <br />Cycle Time (load + haul + spread + retuml <br />Travel time <br />Struck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.60 LCY •" <br />Loading time : 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />loatlmg hme per pair on push-pull motlels <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 400 0.0 8.0 8.0 835 0.53 minutes" <br />Return: 400 0.0 8.0 8.0 1,453 0.28 minutes" <br />"travel time a0iustetl for acceleration antl aeceleration at loatl antl dump points <br />velodties are ngx. attainable per total resistance shown, not average <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,000 <br />Altitutle adjustment factor : 1.00 (Cat HB) <br />Job effciency factor : 0.83 (1 shift/day) <br />Netjob correction factor : 0.83 <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) <br />Unit wst : $0.373 /LCY <br />Total cycle time : 2.40 minutes <br />Adiusted Hourly Production <br />Unadjusted unit production : 713.94 LCY/Hour"' <br />Adjusted unit production : 592.57 LCY/Hour <br />Adjusted fleet production : 592.57 LCY/Hour <br />2 times volume on push-pull motlels <br />Total job time : 16.62 Hours <br />Total job cost : $3,670 <br />