Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />_ _ <br />_._. __ <br />_. ... _. <br />Task # <br />Date <br />User <br />Agency or organization name :OMG <br />04d State :Colorado <br />07/31/2006 County:De/fa <br />SSS Site :Reynolds Pit <br />Permit or otherjob action :New 112c Application <br />Task description :Replace topsoil on 17 acres <br />HOURLY EQUIPMENT COST ~~ <br />Model :Cat 633E Series 2 (2001) Shift basis : i per day <br />Cost Breakdown : Job utilization % Horsepower 490 <br />Ownership cosUhour: $81.70 NA Weight (UST) : 56.34 <br />Operating cosVhour : $114.18 100 Cost data source : (CRG) <br />Operator cosUhour : $24.95 NA <br />Total unit cosUhour : $220.83 Total flee! cosUhour : $220.83 <br />MATERIAL QUANTITIES <br />Initial Swel! Loose <br />volume : 13,713 LCY factor : NA volume : 13,713 LCY <br />Source of quantity take-off :Assume f7 acres covered with avg. 6"of sort <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Hauling Capacity <br />Material description <br />Top Soil <br />Basis <br />weigh}: 1,60D pounds/LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 51.25 LCY <br />Cvcle Time (load + haul + spreatl + return) <br />Travel time <br />Scraper Bowl (volume) Basis <br />Struck volume: 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.60 LCY "' <br />Loading time : 0.90 minutes ` <br />Maneuver and spreading time : 0.70 minutes <br />loatling time per pair on push pull motlels <br />Route I Distance (feet) Grade (%) ~ Roll. res.{%) I Total res.{%) Velocity (fpm) I Travel time (min.) <br />Haul: 400 0.0 8.0 8.0 835 0.53 minutes" <br />Retum: 400 0.0 8.0 8.0 ~ 1,453 I _ 0.28 ~ minutes" <br />"travel time atltustetl forawelemtion antl tleceleration at load antl tlump points <br />velouYes are max. attainable per total resistance shown, not average <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,000 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency.factor: 0.83 (l shifbday) <br />Net job correction factor : 0.83 <br />Total cycle time 2.40 minutes <br />Adiusted Hourlv Production ; <br />Unadjusted unit production : 713.94 LCY/Hour"` <br />Adjusted unit production : 592.57 LCY/Hour <br />Adjusted Fleet production : 592.57 LCY/Hour <br />2 times volume on push pull motlels <br />Permit/job # : M-2006-028 <br />Abbreviation :none <br />Filename : M028-04a <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 23.14 Hours <br />Unit cost : $0.373 /LCY Total job cost : $5,110 <br />