My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110970
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:36 PM
Creation date
11/24/2007 8:09:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006028
IBM Index Class Name
Permit File
Doc Date
8/1/2006
Doc Name
112c Application Bond Calculation
From
CIRCES
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />O6a State :Colorado <br />07/31/2006 County :Delta <br />SSS Site :Reynolds Pit <br />Permit or other job action :New 112c Application <br />task description :Replace topsoil on 1 acre south parcel disturbance <br />;: ,: <br />_,. _. <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 (2001) <br />Cost Breakdown <br />Initial <br />volume : 806 <br />LCY <br />Job utilization <br />NA <br />NA <br />Total Fleet cosUhour <br />Shift basis : 1 per day <br />Horsepower : 490 <br />Weight (UST) : 56.34 <br />Cost data source : (CRG) <br /> <br />$220.83 <br />Swell Loose <br />factor : NA volume : 806 LCY <br />Source of quantity takeoff :Assume 1 acre covered with avg. 6"ofsoil <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Haulino Caoaciri <br />Scraper Payload (weight) Basis <br />Material weight: 1,600 pountls/LCY <br />Material description <br />Top Soil <br />Rated payload : 82,000 pountls <br />Payload capacity: 51.25 LCY <br />Cvcle Time (load + haul + spread + retuml <br />Travel time <br />Bowl (volume) Basis <br />Struck volume <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />Loading time <br />Maneuver and spreading time <br />' IoaEing time per pair on push-pull matlels <br />Permiujob#:M-2006-028 <br />Abbreviation :none <br />Filename : M028-06a <br />34.00 LCY <br />28.60 LCY <br /> <br />28.60 LCY "' <br />0.90 minutes' <br />0.70 minutes <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) ~ Travel time (min.) <br />Haul : 400 0.0 8.0 8.0 835 0.53 minutes `" <br />Return :~ 400 ~ 07 D 8.0 ~ 8.0 ~ 1,453 I 0.28 minutes " <br />° travel time atljustetl for acceleration antl tleceleration at loatl antl tlump paints <br />velxihes are niaa. anainable per total resistance shown, nol average <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,000 <br />Altitude adjustment factor : 7.00 (Cat HB) <br />Job effciency factor : 0.83 (1 shifUday) <br />Net job correction factor : 0.83 <br />Total cycle time 2.40 <br />Adiusted Hourlv Production <br />Unadjusted unit production <br />Adjustetl unit production <br />Adjusted fleet production <br />times volume on push-pun rmdNs <br />713.94 <br />592.57 <br />592.57 <br />minutes <br />LCY/Hour"' <br />LCY/Hour <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size : 1 Scmper(s} Total job time : 1.38 Hours <br />Unit cost : $0.373 /LCY Total job cost : $300 <br />Ownership cosUhour : $81.70 <br />Operating cosUhour $114.18 <br />Operator cosUhour : $24.95 <br />Total unit cosUhour : $220.83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.