My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110787
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:30 PM
Creation date
11/24/2007 8:01:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007031
IBM Index Class Name
Permit File
Doc Date
5/29/2007
Doc Name
Permit Application Adequacy
From
DRMS
To
The Turquoise Connections Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/1&2007 <br />User : BMK <br />State :Colorado <br />County :Teller <br />Site :Scott Biue # 2 <br />Agency or organization name :ORMS <br />Permit or otherjob action :CUT SLOPES TO 3:1 <br />Task description :CUT SLOPES TO 3:1 <br />PermiUjob# : A1.1007-031 <br />Abbreviation :none <br />Filename :M031-001 <br />HOURLY EQUIPMENT COST <br />Basic machine : <br />Cat D8R - 6S (2003) Horsepower : <br />165 <br />Blade type : Straight <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $27.92 <br /> <br />Operating cosUhour <br />: $38.89 100 <br />Ripper op. cosUhour : $1.18 40 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $100.77 Total fleet cosUhour : $100 77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />factor: 1.165 volume: 2,728 LCY <br />volume : 2,340 CCY <br />Source of estimated volume :EXHIBIT E <br />Source of estimated swell factor :EXHIBIT E ;; <br />-~ ~_~ n., a ~.,... l`nrwrhnn F~efnrs ~~ SOUfCe ~~~ <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted haudy production : 153.6 LCY/hr <br />Material consistency descdption <br />Consolidated stockpile <br />Average push gradient : 2.00 % (~ <br />Average site altitude : 9,000 feet <br />Malarial weight : 2,900 Ibs/LCY <br />Weight description <br />narnmaosed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $1.323 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.50 <br />Adjusted unit production : 76.14 <br />Adjusted Beet production : 78.14 <br />Total job time : 35.80 <br />Total job cost : 53,808 <br />LCY/hr <br />LCYlhr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.