My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110787
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:30 PM
Creation date
11/24/2007 8:01:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007031
IBM Index Class Name
Permit File
Doc Date
5/29/2007
Doc Name
Permit Application Adequacy
From
DRMS
To
The Turquoise Connections Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date <br />User <br />18-May-2007 Permit or job no. <br />BMK Abbreviation <br />Filename <br />Agency or organization name :DRMS <br />M-2007-031 <br />none <br />M031-000 <br />Site :Scott Blue # 2 <br />Sfate :Colorado <br />County :Teller <br />Permit or iob action :NEW APPLICATION <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 CUT SLOPES TO 3:1 dozer 1 35.8 $$608 <br />002 -APPLY 4 INCHES OF GROWTH MEDIUM dozer 1 11.3 $1,095 <br />003 -RENEGE 1 ACRE ravage 1 5. $647 <br />004 -MOB/ DEMOB mobilize 1 0.1 $97 <br /> SUBTOTALS 52.2 $5,447 <br />` indutles Inflatbn factor atl)usMent of : NA % TOTAL DIRECT COST ` $5,350 <br /> <br /> <br />°_CT COSTS <br />OVERHEAD AND PROFlT- Liability InSUrenCe : 2.02 % Of d%reCf total = $108 <br /> Performance bond : 1.05 % of direct total = $58 <br /> Job superintendent : NA• NA NA total = NA <br /> ProOt : 10.00 % of d/rest total = $535 <br />Trot requkad (a°qp. operatorserwa es sup°r.) TOTAL O 8 P = $699 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT • CONTRACT AMOUNT (direU + O B P) _ $5,049 <br />Financial warranty processing (IegaUrelated costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or conVacVbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $302 <br />CONTINGENCY- NA• NA total = NA <br />• cont/np°ndes accounted roret lark IerN TOTAL INDIRECT COST = $1,002 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $6,352 <br />
The URL can be used to link to this page
Your browser does not support the video tag.