My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110787
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:30 PM
Creation date
11/24/2007 8:01:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007031
IBM Index Class Name
Permit File
Doc Date
5/29/2007
Doc Name
Permit Application Adequacy
From
DRMS
To
The Turquoise Connections Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Ohriaian of Water Resources <br />pepartrnent d Natural Resources <br />1313 Sherman Street. Roam 818 RECEIVED <br />Denver. Cdarado 80203 . <br />y~ A <br />Phone (303)868-3581 <br />207 <br />Y ~3 ~ <br />! ~ <br />f111 <br />FAX (303) 888-3589 <br />Iq~lfwww_watersfate.co.u. Division of R@clamadon, 9i9 Ri14r, Jr. <br />Governor <br />Mlning and Safe <br /> Hartlb D. 6herman <br />DATE: May 31, 2007 Exeatlve Diredar <br />TO: Berhan M. Keffelew, Environmental Protection Specialist 5~°'E I"'DfO1' P E' <br />rplnear <br />CC: Division 2 Office; District 12 Water Commissioner <br />FROM: Clay Kimmi, P.E. <br />RE: Scott Blue R, File No. M-2007-031 <br />Operator: The Turquoise Connection, Inc <br />Contact: Scott Foster, (719) 315-2212 <br />Section 13, Twp 155, Rng 70W, 6th P.M., Teller County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a Feld inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: The applicant states that the main source of water for the operation is to come from spring <br />runoff and summer thunderstorm runoff This location is within the Arkansas River Basin which is <br />over-appropriated. Runoff can only be diverted and used for beneficial purposes if the applicant has <br />a water right that is in priority. It does not appeaz as if the applicant has secured any water rights to <br />use the runoff for beneficial purposes. The applicant cannot use the runoff for the proposed uses at <br />this time. <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.