Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Oate : 05H82007 <br />Usar : 8MK <br />Stale ;Colorado <br />County ;Teller <br />Site ; Scof(t Blue <br />PenniUob#:M-2007-031 <br />Abbreviation :none <br />Filename :M031-002 <br />Agency or organization name : DRMS <br />Permit or other job action :NEW APPLICATION <br />Task description :AppLY4/NCHES OF GROWTH MEDIUM <br />Cost Breakdown <br />Basic machine :Cat D5R - 65 (2003) <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Utilization °k <br />Ownership cosf/hour : $25.02 NA <br />Operating cosf/hour ; $38.89 100 <br />Ripperap.cosf/hour: $0.00 NA <br />Operator cosf/hour : $32.78 NA <br />Total unitcosUhour: $96.69 TotalfleetcosUhour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 647 LCY factor ; <br />Source of estimated volume : EXHIBIT E <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted howdy production : 153.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 % (neg) <br />Average site altitude : 9,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock. 50•~ Earth <br />.:: ,:.:; <br />J08 TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost ; $1.693 /LCY <br />Operator skill <br />Matedal consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Matedal weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower : 165 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />0.75 <br />1.00 <br />1.20 <br />0. <br />1.00 <br />0.79 <br />1.00 <br />0.37 <br />$96.69 <br />57.11 LCY/hr <br />57.11 LCY/hr <br />Total job time : 11.33 Hours <br />Total job cost : 51,095 <br />